Easter Seals Jobs

Job Information

Panasonic North America Controls - Vision Engineering Intern in Sparks, Nevada

Overview

Do you want to join a team that's changing the world? Do you have a strong background as a Controls - Vision Engineering Intern - NV? Then we're looking for you! Check out the job description and apply now! Put your skills to meaningful use, gain unique experience, and work with world-class team members with diverse backgrounds and expertise who share the same vision. Join the PENA team today!

Responsibilities

Panasonic Energy of North America (PENA) is seeking ambitious engineering interns to join the world’s largest lithium ion battery initiative. With superior battery designs and the fastest manufacturing lines in the world, Panasonic is producing millions of batteries per day at the Gigafactory to support Tesla’s electric vehicle and energy storage businesses. Panasonic invites you to join us in this ongoing full-scale effort to electrify our society. At PENA, engineering interns quickly become experts in the fundamentals of lithium-ion cell technology and work to integrate that understanding with high speed, automated manufacturing methods to produce the highest performance and highest quality lithium ion batteries. 

Internship Details:

  • The program will be a fulltime paid summer internship working for Panasonic at the Gigafactory

  • The program will be 12 weeks in length, and is planned to occur between Monday, May 19th and Friday, August 8th . This date range is subject to change

  • Must be able to attend the entirety of the internship

  • Housing allowance provided

Program Requirements:

  • The program will be a fulltime paid summer internship working for Panasonic Energy of North America onsite at the Gigafactory

  • The program will be 12 weeks in length, and is planned to occur between Monday, May 20th and Friday, August 9th. This date range is subject to change

  • Must attend entirety of internship from the indicated start and end date noted above

  • Minimum 3.2 GPA

  • Must have completed a minimum of 2 years at an accredited university

Essential Duties:

  • Participate in Programming, installing, and troubleshooting PLC/Vision systems such as Mitsubishi, Keyence and Omron within the manufacturing processes

  • Assist with design and programming HMI and communication network systems

  • Conducts design and testing work for existing production lines to improve cell manufacturing process on safety, quality and productivity.

  • Analyzes and evaluates machine and test data.

  • Provides engineering support to production teams to resolve manufacturing process issues.

  • Works closely with other team members to increase understanding of failure modes and improve performance of cell manufacturing equipment.

  • Applies principles and knowledge of engineering to solve manufacturing problems.

  • Other duties may be assigned

Personal Protective Equipment (PPE) Requirements:

  • To ensure the health and safety in the workplace and for the protection of our employees, wearing PPE is a possibility and may include equipment such as a full Tyvek suit, safety shoes, gloves, safety glasses, face mask, bump cap, and a full hazmat suit that includes a respirator.

The foregoing description is not intended and should not be construed to be an exhaustive list of all responsibilities, skills and efforts or work conditions associated with the job. It is intended to be an accurate reflection of the general nature and level of the job.

What You'll Bring:

Education:

  • Completion of at least two years of full-time enrollment (minimum 12 credit hours per semester) in a Bachelor’s degree program in Electrical Engineering, Computer Engineering, Mechanical Engineering, Industrial Engineering, or related discipline.

  • Preferred: Electrical and Computer Engineering.

Essential Qualifications:

  • Evidence of exceptional ability. Panasonic follows a culture of full-cycle engineering where members will have full responsibility and accountability for their projects from start to finish. We are looking for the best of the best.

  • Must be currently enrolled as a fulltime student at an accredited four-year college or university

  • GPA of 3.2 or higher

  • Demonstrated experience solving difficult hands-on engineering problems with an ability to clearly articulate technical detail and thought process

  • Familiarity with basic lithium-ion battery chemistry

  • Good understanding of basic manufacturing principles

  • Strong problem-solving skills

  • Strong organizational skills

  • Excellent interpersonal, teamwork, and collaboration skills

  • Strong written and verbal communication skills

  • Ability to write and communicate technical information clearly and concisely

  • Fluency with Microsoft Office Suite (Word, PowerPoint, Excel, Outlook)

  • Ability to apply principles of logical or scientific thinking to a wide range of intellectual and practical problems

Preferred Qualifications:

  • GPA of 3.2 or higher

  • Hands-on experience through project teams or previous jobs

  • Knowledge in programmable platforms, PLC, and embedded controls using programming languages

  • A desire to create a sustainable future through energy storage, renewable energy, and electric vehicles

Physical Demands:

Physical Activities: (Percentage of time (equaling 100%) during the normal workday the employee is required to)

  • Sit: 40%

  • Walk: 30%

  • Stand: 20%

  • Lift: 10%

Tools and/or Equipment: (Required frequency is: Not required (0%), Occasional (1-33%), Frequent (34-66%, Continuous (67-100%)

  • Keyboard/Computer: Continuous

  • Office Equipment: Continuous

  • Phone Continuous

Required Lifting and Carrying: (Required frequency is: Not required (0%), Occasional (1-33%), Frequent (34-66%, Continuous (67-100%)

  • Up to 10 lbs.: Occasional

  • Up to 20 lbs.: Occasional

  • Up to 35 lbs.: Occasional

  • Team-lift only (over 35 lbs.): Not Required

About Us:

Panasonic Energy of North America (PENA) is collaborating with Tesla at a massive battery factory near Reno, Nevada which is known for its quality of life and expansive outdoor adventures. Panasonic's role at the Gigafactory is to manufacture and supply cylindrical lithium-ion cells to Tesla for their electric vehicles and energy storage systems.

Over the past few years, the Gigafactory has grown to the largest lithium-ion battery factory in the world. Together with our partner Tesla, we continue to revolutionize the lithium-ion battery space and accelerate the world’s transition to sustainable energy and transportation.

Our mission at PENA is to make the vision of affordable Electric Vehicles a reality by producing the world’s safest, high quality, and lowest cost batteries. Through this effort we will create a clean energy society and our products will change society’s use of and perceptions of electric power.

In addition to an environment that is as innovative as our products, we offer competitive salaries and benefits.

Supplemental Information:

Pre-employment drug testing is required. Due to the high volume of responses, we will only be able to respond to candidates of interest. All candidates must have valid authorization to work in the U.S. without restriction.

Panasonic is an Equal Opportunity employer, and all qualified applicants will receive consideration for employment without regard to race, color, religion, gender identity, sex, sexual orientation, national origin, disability status, protected veteran status, and any other characteristic protected by law.  All qualified individuals are required to perform the essential functions of the job with or without reasonable accommodation.

Thank you for your interest in Panasonic Energy of North America.

REQ-146884

DirectEmployers